The team at Fire Island Wind - a remote wind farm in Alaska run by GE Renewable Energy - needed repairs to a wind turbine heat exchanger. Replacing these heat exchangers is a logistical challenge, as they need to be drained, removed, and replaced, requiring hours of labor and costing up to $80,000.